
Author: Anke Beneke
-
Read more: Elora Gorge Low Level Bridge Rehabilitation, Canada
A low level bridge at the Elora Gorge Conservation Area was in need of repair above and below the water level.
-
Read more: Dune reinforcement after cyclone, Australia
Paradise Beach on the Gold Coast was severely impacted by Cyclone Alfred in March 2025, which removed more than 4 mio. m³ of sand from the shoreline.
-
Read more: We’re attending: EuroGeo 2025 – Europe’s leading conference on geosynthetics
EuroGeo 8 in Lille – We’re Exhibiting! From 15 to 18 September 2025, the 8th European Conference on Geosynthetics – EuroGeo 2025 will take place in Lille, France. As the leading event of its kind in Europe, the conference brings together experts from research, civil engineering, infrastructure planning, and sustainability. Organised by the International Geosynthetics…
-
Read more: Hello from the GeoAsia8 in Brisbane
Presentation at the GeoAsia8 in Brisbane Today Dr Sanjay Charati (Garware Technical Fibres Limited) and Simon Restall (Geofabrics Australasia), gave their exciting presentation on “Erosion control with virgin HDPE mesh for superior durability in hybrid engineering” at GeoAsia8 in Brisbane. They analysed the different effects of PET, rPET and HDPE on the environment. The clear…
-
Read more: New construction of the Heegermühler lock in Eberswalde, Germany
As part of this ambitious project, the lower outer harbor had to be backfilled to address space limitations.
-
Read more: Bridge scour protection in Metz, France
Reinforcing the Pont de Fer at Ars-sur-Moselle: an additional solution to prevent scouring
-
Read more: Derwent Reservoir – Erosion Protection with AquaRockBag® in Derbyshire, UK
A significant scour hole—about 4–5 meters deep and 210 m³ in volume—was discovered at the Ashop inlet of Derwent Reservoir.
-
Read more: Rapid Flood Response with AquaRockBag® in Sacramento, USA
Following a period of intense rainfall in the Sacramento area, Auburn Ravine experienced serious flooding.
-
Read more: Stabilization Project in Manchester, UK
A large crack had formed in a car park on the outskirts which required urgent remedial works to prevent a further geotechnical failure.
-
Read more: Temporary Working Platform in South Carolina, USA
The customer was needing to construct a working platform along the banks of the Saluda River in Columbia, SC to allow them to place their heavy equipment needed for construction for a short time and to be able to be easily removed upon completion.










